Solar Site Construction

Precision Site Preparation for Maximum Solar Performance

Your Energy Partner. Every Step of the Way.

Solar Site Construction

Building the Foundation for Long-Term Performance

Your Solar System Is Only as Strong as Its Foundation
Poor site preparation leads to system under performance, higher maintenance costs, and premature failure. GenPro’s solar site construction team ensures every installation begins with a solid, engineered foundation designed for decades of reliable performance.

Our Site Construction Services

Site Feasibility & Evaluation

Drone-assisted surveys, soil testing, and topographic analysis for optimal system placement.

Precision Site Prep

Grading, trenching, and erosion control to maintain structural integrity.

Structural Reliability

Foundations and racking anchor systems engineered to withstand local wind, snow, and seismic loads.

Why It Matters

Proper site construction directly impacts system output, reliability, and cost over time. GenPro’s proven methods reduce long-term risks like racking misalignment, ground shifting, and drainage failure—resulting in better energy yield and lower maintenance.

Higher Annual Output

Proper grading and system tilt can significantly improve energy capture.

Reduced Long-Term Costs
Quality foundations prevent ground shifting and racking misalignment.
Proven Approach

Fremont, Nebraska

During the Fremont Community Solar project, advanced grading and soil stabilization techniques resulted in:
  • Zero post-installation settlement issues after 18 months.
  • Increased racking precision, boosting energy production by 4% compared to baseline models.

Site Prep That Powers Long-Term Performance.

From topographic analysis to final racking alignment, GenPro’s construction approach is built for output. Proper grading, foundation anchoring, and soil compaction can boost energy yield by 4% and reduce lifetime maintenance by 40%. We build it right—right from the start.